ZF 8HP90A Wiring Guide

Installing universal standalone GCU requires certain modifications to be done to the mechatronics unit inside this type of ZF 8HP transmissions.

To modify it You’ll need:

CAUTION: This modification require soldering experience and steady hand due to very tight location of soldering

  1. Drain transmission fluid by removing screw in oil pan.
  2. Unscrew the plastic oil pan.



  1. Disconnect wiring connectors from solenoids and HIS.
  2. Pull a metal plate located on the opposite side to the pump to unlock round connector from the body.
  3. Unscrew mechatronics unit.



  1. Remove stock TCM from valve body.
  2. You’ll be able to see metal box. With grinder remove cap of box paying attention not to let grinder far inside this box to avoid damaging solder points.
  3. Round connector in ZF 8HP90 Transmission is connected to TCM plate with cables but lacks connection to pins numbered 2 and 11.



Rewire lacking connections using 1mm^2 Ptfe wire and clamps according to table below
TCM Pin Round Connector Pin
A1 11
A13 2

  1. Remove bondings from stock TCM to solder pads, and remove TCM itself with chisel.
  2. Solder wires according this scheme.



A1 C2
A2 C3
A3 B4
A4 B5
A5 C4
A6 B3
A7 B6
A8 C14
A9 B2
A10 C5
A11 C12
A12 C7
A13 C13
A14 B10,11,12,14
A15 B10,11,12,14
A16 B7
A17 B8
A18 B9

  1. Soldered area should look like on the picture below.



  1. Secure wires with silicone packaging to protect them from short circuits, and form moving inside of metal box.
  2. Making such wiring inside allows to use case connector. To make patch loom GCU - transmission.


Patch loom should be made basing on above case connector and below GCU Main Connector pinout.

There is need to add pullup/pulldown resistors on following connections please put those resistors close to the GCU and make sure they aren’t vulnerable to mechanical damage:

  1. FREQ_in1 (A3) required 100R pull down to s_GND (L2) at GCU end
  2. FREQ_in2 (A4) required 100R pull down to s_GND (L2) at GCU end
  3. AN_in1 (C1) requires 2k6 pull up to +5v_out (M1) at GCU end
  4. AN_in2 (C2) requires 500R pull up to +5v_out (M1) at GCU end

HTG GCU requires main (MAIN RELAY’ed) battery +12v applied to +12_const (M3, M4), as well as ignition +12v signal applied to +12_IGN (L1).

Even though HTG GCU has internal protection it is advised to secure IGN signal with 5A fuse to prevent failure of the device.

Ground connections GND (L3 and L4) should be made on engine or chassis, as long as chassis ground point is confirmed to be efficient.



For proper functionality HTG GCU needs to be fed with ECU signals. Those signals are used to configure and map transmission operation.

To communicate with ECU AN_out1-4 (A1,A2,B1,B2) can be used as CAN_1 and CAN_2